Southern Gateway Design Build

Photo credit: Pegasus  Link Constructors

Project Detailsx

Client: WSP USA for TxDOT
Job Status: Final Design Completed
Location: Dallas, Texas
Scope: Hydrology & Hydraulic Design
Services: Highways & Tollways, Water Resources

Project Overviewx

Hayden is providing Hydrologic and Hydraulic design of Segment 2, which is along US 67, from Kiest Blvd. to IH20, in Dallas, Texas. The improvements for this segment include widening the managed lanes from 4 to 6 lanes, 1 reversible managed lane and slip ramp modifications. Hayden is responsible for the off-site design of 4 culverts and 2 FEMA bridges at Woody Branch and 5-mile creek and the onsite Geopak drainage design for the entire 8-mile stretch between Kiest and IH20.